Project Detail

A Trusted

Design-Build Partner

Architecture

Engineering

Construcion

Spring/Fishburne Drainage Improvements – Phase 5 Pump Station

🌉 Project Overview

As part of the ongoing multi-phase improvements to the Spring/Fishburne U.S. 17 Drainage Project, Bastion Group was engaged to support the construction of a Phase 5 pump station—a critical infrastructure component helping mitigate flooding in downtown Charleston.

🛠️ Scope of Services

Bastion Group provided structural engineering services specific to cold-formed metal framing systems within the pump station’s mechanical housing:

  • Reviewed architectural and structural design documents
  • Performed load determination and compliance review per ASCE 7-22 and IBC 2021
  • Delivered stamped structural shop drawings for all light gauge components
  • Collaborated with the project team to ensure framing was engineered efficiently and compliant with code

⚙️ Engineering Strategy

This project showcases Bastion’s agility in delivering targeted light gauge engineering within larger infrastructure efforts. The framing elements serve key mechanical systems that support the station’s long-term performance under Charleston’s coastal conditions.

✅ Value Delivered

Bastion’s contribution supports the City of Charleston’s flood resiliency strategy by enabling safe, code-compliant integration of critical infrastructure—within budget, and on schedule.

 

Similar Projects