Project Detail

A Trusted

Design-Build Partner

Architecture

Engineering

Construcion

CMMC Navy Yard Industrial Campus

🏗️ Project Overview

Bastion Group was selected to perform a comprehensive structural review of Building 5 at the CMMC Navy Yard Industrial Campus—an important step in preparing the facility for potential new use and increased operational demand.

🔍 Scope of Services

The project involved a phased approach to determine the allowable load capacity of the building’s second floor, originally designed for light industrial operations. Bastion engineers conducted a thorough review of existing design documentation, followed by on-site evaluations to verify critical structural information.

Depending on findings, engineering support also included:

  • Field verification of structural systems
  • Load rating calculations in compliance with modern code standards
  • Conceptual recommendations for remediation or reinforcement, if necessary

🧠 Engineering Insight

By combining historical documentation analysis with modern field evaluation, Bastion Group helped ensure that the space could be safely and effectively utilized for future operations without compromising structural integrity.

✅ Value Delivered

This assessment provided the client with a clear, data-backed understanding of the building’s performance potential—allowing for confident planning, budgeting, and repurposing of the industrial space.

Similar Projects