Project Detail

A Trusted

Design-Build Partner

Architecture

Engineering

Construcion

Waste Management – Ridgeland

Interior upfit of an 18,000 square foot pre-engineered metal building including CMU block, concrete, structural steel, miscellaneous metals, steel stud framing, insulation, drywall, paint, storefront glass, doors and hardware, flooring, ceilings, cabinetry and countertops, and finishes.

Similar Projects